
Compliance
PCI DSS Awareness Training: Proving 12.6 Without the Vendor
PCI DSS 12.6 wants training on hire and every 12 months plus annual policy acknowledgements. What an assessor samples, and how to keep that evidence yourself.
Security awareness is the requirement most teams hand to a vendor and forget, until an assessor asks what a completion dashboard cannot answer: who should have been trained, when did each of them start, and which policy version did they acknowledge? This article reads Requirement 12.6 as an evidence problem and builds the answer on infrastructure you control.
Requirement 12.6 is five obligations, not one
PCI DSS v4.0.1 splits awareness into five requirements, each tested separately.
- 12.6.1 — "A formal security awareness program is implemented to make all personnel aware of the entity's information security policy and procedures, and their role in protecting the cardholder data."
- 12.6.2 — the programme is "Reviewed at least once every 12 months" and "Updated as needed to address any new threats and vulnerabilities" that may affect cardholder data, sensitive authentication data, or what personnel are told about their role.
- 12.6.3 — personnel receive training "Upon hire and at least once every 12 months"; "Multiple methods of communication are used"; and personnel "acknowledge at least once every 12 months that they have read and understood the information security policy and procedures."
- 12.6.3.1 — training covers threats and vulnerabilities that could impact the security of cardholder data and/or sensitive authentication data, "including but not limited to: Phishing and related attacks. Social engineering."
- 12.6.3.2 — training covers "the acceptable use of end-user technologies in accordance with Requirement 12.2.1."
Note that 12.6.3 bundles three clocks: upon hire, every 12 months, and an acknowledgement every 12 months. One completion timestamp is evidence of a single attendance; on its own it shows neither training upon hire, nor a 12-month interval, nor the policy acknowledgement. And the numbering changed: some well-ranked explainers still number "educate upon hire and annually" in the older v3.2.1 style, so check which version advice was written against.
Methods the 12.6.3 guidance lists include "posters, letters, web-based training, in-person training, team meetings, and incentives," and "Personnel acknowledgments may be recorded in writing or electronically." Its Good Practice text suggests entities "may incorporate new-hire training as part of the Human Resources onboarding process" and "should consider" training anytime personnel transfer into roles where they can impact cardholder data security.
Two adjacent obligations sit outside 12.6 and this programme: 6.2.2 (software development personnel working on bespoke and custom software, trained at least once every 12 months) and 12.10.4 (incident response personnel, "appropriately and periodically trained", with 12.10.4.1 setting that frequency through the entity's targeted risk analysis).
Which parts were future-dated, and why the date no longer matters
12.6.2, 12.6.3.1 and 12.6.3.2 each carry the same applicability note: "This requirement is a best practice until 31 March 2025, after which it will be required and must be fully considered during a PCI DSS assessment." 12.6.1 and 12.6.3 carry no such note. That date has passed, so none of the five is best-practice-only in the standard any more. Whether all five appear in your validation depends on the form: SAQ A for v4.0.1 as published in October 2024 contained no 12.6 item at all. That edition has since been revised, so confirm against the current revision of your form rather than an archived PDF. Which form you are on is its own question, covered in when the SAQ path closes.
Section 7 of the standard sets how recurring activities are judged. In a first assessment, an activity with a defined timeframe need not have been performed for every timeframe in the previous year, if it was performed within the most recent timeframe and the entity has documented policies and procedures to continue it. In subsequent years it must have been performed at least once within each required timeframe. The PCI SSC FAQ on initial assessment restates that initial-assessment test.
What the assessor actually samples
Under the defined approach, the testing procedures for 12.6.3 are specific. Under the customized approach there are no defined testing procedures; the assessor derives procedures appropriate to the entity's implementation to validate the objective, so treat the list below as the defined-approach baseline, not as what every assessor does.
- 12.6.3.a — "Examine security awareness program records to verify that personnel attend security awareness training upon hire and at least once every 12 months."
- 12.6.3.b — examine programme materials for multiple methods of communicating awareness.
- 12.6.3.c — "Interview personnel to verify they have completed awareness training and are aware of their role in protecting cardholder data."
- 12.6.3.d — examine programme materials and personnel acknowledgments to verify acknowledgement at least once every 12 months.
For 12.6.2 the assessor examines "security awareness program content, evidence of reviews, and interview personnel." A completion date with no hire date beside it cannot show "upon hire."
Section 6, on sampling, decides where records come from. "The assessor must select the sample from the complete population without influence from the assessed entity." For periodic requirements, "the assessor should attempt to select a sample that represents the entire period covered by the assessment," and "Different samples must be selected for each assessment." The same section names personnel as a sampling case ("a sample of administrators vs. a sample of all employees") and says that where standardized processes apply to each item in the population, "the sample can be smaller," though still large enough for reasonable assurance and, outside narrow exceptions, greater than one. Assessors are encouraged to test the whole population automatically where it "can be tested quickly and efficiently."
So the entity's own record should line up, for every person: hire date, each training completion, each acknowledgement date, and the policy version acknowledged. That is not a testing procedure, but it lets an assessor sample anywhere in the period, or query the whole population. It is the same argument as PCI DSS security metrics for the system-side clocks: recurring obligations are proven by records spanning the period, not a late snapshot.
Personnel means contractors too
"All personnel" in 12.6.1 is a defined term. The v4.0.1 glossary: "Full-time and part-time employees, temporary employees, contractors, and consultants with security responsibilities for protecting account data or that can impact the security of cardholder data and/or sensitive authentication data." The second prong matters: the definition is not limited to people whose job title is security. Anyone who can impact cardholder data security is in.
So the training tool's enrolment list cannot be the population of record. An LMS knows only the people somebody enrolled; a contractor onboarded through a supplier or a consultant given access for a quarter can exist in the identity provider and nowhere in the training system. The population has to come from wherever access is granted, usually HR plus the IdP. If identity is already self-hosted, the self-hosted SSO stack is the natural place to read it from. Scope still decides who counts: the audit-scope evidence work tells you which roles can impact cardholder data.
Phishing training is required; phishing simulation is not
12.6.3.1 is a content requirement: the training must cover phishing and related attacks and social engineering. The simulated-phishing campaign that many programmes are built around sits in the Good Practice text, not the requirement: "An effective security awareness program should include examples of phishing emails and periodic testing to determine the prevalence of personnel reporting such attacks." Running simulations is sensible. It is not what 12.6.3.1 asks the assessor to verify.
The standard also keeps the technical control apart from the training. The 12.6.3.1 applicability notes point to Requirement 5.4.1 for automated anti-phishing controls and says: "These are two separate and distinct requirements, and one is not met by implementing controls required by the other one." A mail gateway does not discharge the training obligation, and a training module does not discharge the gateway obligation.
What a vendor portal holds, and what it does not
This is a gap analysis against the testing procedures, not a claim about any product. Check whatever your tool exports:
- Population. Everyone in the glossary definition, or only those enrolled?
- Hire date. Beside each completion, so "upon hire" is testable?
- Acknowledgement. Recorded and dated separately from completion, as 12.6.3.d examines?
- Version. Which policy version and content revision each person saw, so a 12.6.2 update ties to the people trained on it?
- Materials. Can you produce past-period materials (12.6.3.b) and review history (12.6.2) after the vendor updates its library?
Any "no" is evidence outside your control. PCI SSC's 2014 information supplement on awareness programmes, which predates v4 and is cited only for general practice, already advised entities to "Implement tracking mechanisms to record who completes the training and when" and listed HR onboarding records alongside computer-based training records as sources.
Self-hosted building blocks: Moodle, GoPhish and a git-versioned programme
Three open-source pieces cover the chain. Each has a catch.
Moodle: completions and versioned acknowledgements
Moodle is GPL-3.0; the current tag is v5.3.1. Two parts of its schema matter. Core course_completions records timeenrolled, timestarted and timecompleted, with a unique index on (userid, course): one completion record per person per course. The consequence, reasoned from the schema rather than Moodle documentation: an annual cycle needs a new, dated course instance each year, not a second pass through the same course.
The policies plugin, tool_policy, stores policy versions with a human-readable revision, and acceptances in tool_policy_acceptances tied to a specific policyversionid, with status (1 accepted, 0 not accepted), lang, timecreated, and a note describing how consent was obtained when accepted on another user's behalf. That is a per-version acknowledgement ledger, which is exactly what 12.6.3.d examines.
The catches. Moodle's own help text says "Users are not required to agree to the policy again if the edit is marked as a minor change." So an annual re-acknowledgement needs a non-minor new version: leave the minor-change box unticked. Saving a non-minor edit creates a new tool_policy_versions row; if active, make_current runs and sets policyagreed to 0 for every user. With optional = 0, "the policy must be accepted to use the site." Setting optional = 1 lets a user decline as well as accept, and either response clears Moodle's gate. The gap query ignores a decline (status = 0): it flags only when no status = 1 acceptance meets the 12-month tests, so declining a newer version does not flag an acceptance still inside 12 months. policyagreed stays false until each user responds, and on their next page load require_login sends every non-admin user (site admins and web-service accounts excepted) to the policy page. And audience can only be all users, logged-in users or guests, never the PCI population.
So the realistic choices are a separate Moodle site for the in-scope population, or accepting that every non-admin user re-acknowledges. One precondition: tool_policy records acceptances and performs its redirect only when $CFG->sitepolicyhandler is set to tool_policy. Confirm that setting before treating a single mdl_tool_policy_acceptances row as 12.6.3.d evidence.
GoPhish: the shape of simulation evidence
GoPhish is MIT-licensed, and its REST API exposes per-campaign results and an event timeline at GET /api/campaigns/:id/results. That is the right shape for Good Practice testing evidence: who was sent what, and what they did, with timestamps. Two facts limit it. The latest GitHub release is v0.12.1, published 2022-09-14, and CVE-2025-70963 states that in Gophish 0.12.1 and earlier "The administrative dashboard exposes each user's long-lived API key directly inside the rendered HTML/JavaScript of the page on every login." Treat it as a model of simulation evidence, not something to put on a reachable network; none of it is what 12.6.3.1 requires.
Git: the programme and its review history
The programme, syllabus, module source and each 12.6.2 review record belong in a plain git repository: every content change a commit, every annual review a signed tag. That gives 12.6.2 its "evidence of reviews" and 12.6.3.b its materials for any past date.
Wiring the evidence: one query, one tag, one manifest
The query joins an HR roster (hr_personnel, an example schema) to Moodle. That roster must already be HR joined with the identity provider. If hr_personnel is fed from payroll alone, every export below inherits the gap and a clean result means nothing. The 30-day onboarding window is an internal target the entity sets, not a PCI DSS figure: the standard says "upon hire."
Two design choices follow from the schema. Because course_completions holds one row per person per course, a 12-month test cannot look at this year's course alone: someone who finishes it today after twenty months without training has a fresh timestamp and still had a gap. So the query reads every awareness course, onboarding plus each annual instance, and tests the interval between consecutive completions as well as the age of the latest. Acknowledgements get the same treatment across every accepted version of the policy, joined through tool_policy_versions.policyid, because each version is a separate acceptance row. Upon hire is judged on the onboarding course alone, so a later annual course cannot quietly clear a missed onboarding. Moodle stores Unix epochs; the query compares in UTC, so a day boundary does not move with the session time zone.
-- Valid only where $CFG->sitepolicyhandler = 'tool_policy'; otherwise
-- mdl_tool_policy_acceptances is empty and everyone is flagged.
-- mdl_ is Moodle's default table prefix; it is configurable.
-- hr_personnel(email, worker_type, hire_date, leave_date) is an example
-- roster and must already hold the HR-plus-IdP population.
-- Moodle stores Unix epochs; every comparison here is made in UTC.
-- 12-month clocks compare calendar dates, not clock times: Section 7
-- accepts "the same date every year", so the anniversary itself passes.
-- asof_utc is now, or the leave date for a leaver (least() skips a NULL):
-- a clock that runs out only after someone left is not a miss.
WITH params AS (
SELECT :'period_start'::date AS period_start,
now() AT TIME ZONE 'UTC' AS now_utc
),
pop AS (
SELECT h.email, h.worker_type, h.hire_date, u.id AS userid,
least(params.now_utc, h.leave_date::timestamp) AS asof_utc
FROM hr_personnel h
CROSS JOIN params
LEFT JOIN mdl_user u ON lower(u.email) = lower(h.email)
WHERE h.leave_date IS NULL OR h.leave_date >= params.period_start
),
-- every awareness completion: the onboarding course and each annual instance
training AS (
SELECT userid, course,
to_timestamp(timecompleted) AT TIME ZONE 'UTC' AS done_at
FROM mdl_course_completions
WHERE course IN (:onboarding_course, :annual_courses)
AND timecompleted IS NOT NULL
),
-- upon hire is judged on the onboarding course alone
onboard AS (
SELECT userid, min(done_at) AS done_at
FROM training WHERE course = :onboarding_course
GROUP BY userid
),
-- every acceptance of any version of the policy
acks AS (
SELECT a.userid, to_timestamp(a.timecreated) AT TIME ZONE 'UTC' AS done_at
FROM mdl_tool_policy_acceptances a
JOIN mdl_tool_policy_versions v ON v.id = a.policyversionid
WHERE v.policyid = :policy_id AND a.status = 1
),
-- each event paired with the one before it; the first is paired with hire
steps AS (
SELECT p.userid, e.kind, e.done_at,
lag(e.done_at, 1, p.hire_date::timestamp)
OVER (PARTITION BY p.userid, e.kind ORDER BY e.done_at) AS prev_at,
max(e.done_at) OVER (PARTITION BY p.userid, e.kind) AS last_at
FROM pop p
JOIN (SELECT userid, 'training' AS kind, done_at FROM training
UNION ALL
SELECT userid, 'acknowledgement', done_at FROM acks) e
ON e.userid = p.userid
),
last_seen AS (
SELECT DISTINCT userid, kind, last_at FROM steps
)
-- per-person checks
SELECT p.email, p.worker_type, p.hire_date, g.gap, g.at_utc
FROM pop p
CROSS JOIN params
LEFT JOIN onboard o ON o.userid = p.userid
LEFT JOIN last_seen t ON t.userid = p.userid AND t.kind = 'training'
LEFT JOIN last_seen k ON k.userid = p.userid AND k.kind = 'acknowledgement'
CROSS JOIN LATERAL (VALUES
(CASE WHEN p.userid IS NULL THEN 'no moodle account' END, NULL::timestamp),
(CASE WHEN p.userid IS NOT NULL
AND p.hire_date >= params.period_start
AND p.hire_date + 30 <= p.asof_utc::date
AND (o.done_at IS NULL OR o.done_at >= p.hire_date + 31)
THEN 'upon hire: onboarding not completed within 30 days' END,
o.done_at),
-- the 12-month clocks start at hire, so nobody is judged on them
-- until a full 12 months of service have passed
(CASE WHEN p.userid IS NOT NULL
AND p.hire_date <= (p.asof_utc::date - interval '12 months')::date
THEN CASE
WHEN t.last_at IS NULL
THEN 'training: no completion on record after 12 months'
WHEN t.last_at::date < (p.asof_utc::date - interval '12 months')::date
THEN 'training: latest completion older than 12 months'
END END,
t.last_at),
(CASE WHEN p.userid IS NOT NULL
AND p.hire_date <= (p.asof_utc::date - interval '12 months')::date
THEN CASE
WHEN k.last_at IS NULL
THEN 'acknowledgement: no acceptance on record after 12 months'
WHEN k.last_at::date < (p.asof_utc::date - interval '12 months')::date
THEN 'acknowledgement: latest older than 12 months'
END END,
k.last_at)
) AS g(gap, at_utc)
WHERE g.gap IS NOT NULL
UNION ALL
-- closed intervals: a completion or acceptance inside the period that came
-- on a later calendar date than 12 months after the previous one (or after
-- the hire date)
SELECT p.email, p.worker_type, p.hire_date,
s.kind || ': more than 12 months after the previous one', s.done_at
FROM pop p
CROSS JOIN params
JOIN steps s ON s.userid = p.userid
WHERE s.done_at >= params.period_start
AND s.done_at::date > (s.prev_at::date + interval '12 months')::date
ORDER BY 1, 4;
An empty result proves something narrower than "everyone is trained". For every person on the roster: nobody hired in the period missed the onboarding target; nobody with at least 12 months of service lacks a completion or acceptance, or has a latest one older than 12 months; and no completion or acceptance inside the period arrived more than 12 months after the previous one, or after the hire date for a first record. Every 12-month test compares UTC calendar dates, because Section 7 defines every 12 months as "At least once every 365 (or 366 for leap years) days or on the same date every year." A gap means a later calendar date, never a later clock time on the anniversary. Pairing a first record with the hire date is deliberate. A long-tenured person whose first Moodle record sits inside the period is flagged, because the query cannot see training that predates it, so import legacy completions before the first run. The acknowledgement is a 12-month obligation, not an upon-hire one, so a new hire without an acceptance is not flagged until 12 months after the hire date. For a leaver, both 12-month clocks are judged at the leave date rather than today, because a clock that runs out only after someone left is not a miss. An empty result says nothing about content quality, multiple methods, or whether anyone understood the material; those come from git and from the 12.6.3.c interviews.
A staleness or interval row on any 12-month clock (the 12.6.3 training and acknowledgement, and the 12.6.2 review tracked in git) is the input to Section 7, which governs missed recurring activities. An upon-hire miss or a missing Moodle account is not a Section 7 timeframe; it is a control failure to fix directly. The entity needs documented, implemented processes so it "is promptly notified any time an activity is not performed per its defined schedule," "determines the events that led to missing a scheduled activity," "performs the activity as soon as possible after it is missed and either gets back on schedule or establishes a new schedule," and "produces documentation that shows the above elements occurred." Where that happened, "the entity is not automatically non-compliant if the activity is performed late." Where no such process exists or the miss came from "oversight, mismanagement, or lack of monitoring," the entity "has not met the requirement" until it documents the process, re-establishes the schedule and shows the activity performed at least once on it. A scheduled run only writes the CSV, and the script still exits 0 when that file has gap rows; alerting someone is a separate step the entity must build. The query never sees a missing signed review tag, so the 12.6.2 review needs its own reminder.
The 12.6.2 review itself is a dated note under programme/reviews/ recording what content was reviewed and what changed for new threats; the script below refuses to tag without one. Beside it go three 12.6.3.a and 12.6.3.d exports, the population, attendance and acknowledgement record, which are not the programme review. The roster export is the population an assessor samples from. The timeline puts the hire date on every completion and acceptance row, so any sampled person's "upon hire" and 12-month intervals read from one file:
#!/usr/bin/env bash
set -euo pipefail
: "${MOODLE_DSN:?set MOODLE_DSN}"
: "${PERIOD_START:?}" "${ONBOARDING_COURSE:?}" "${ANNUAL_COURSES:?}" "${POLICY_ID:?}"
[[ "$PERIOD_START" =~ ^[0-9]{4}-[0-9]{2}-[0-9]{2}$ ]] ||
{ echo "PERIOD_START must be YYYY-MM-DD" >&2; exit 1; }
[[ "$ONBOARDING_COURSE" =~ ^[0-9]+$ && "$POLICY_ID" =~ ^[0-9]+$ ]] ||
{ echo "ids must be integers" >&2; exit 1; }
[[ "$ANNUAL_COURSES" =~ ^[0-9]+(,[0-9]+)*$ ]] ||
{ echo "ANNUAL_COURSES is a comma-separated list of course ids" >&2; exit 1; }
REPO="${REPO:-$HOME/awareness-programme}"
STAMP="$(date -u +%Y-%m-%d)"
OUT="evidence/$STAMP"
cd "$REPO"
if ! git diff --quiet || ! git diff --cached --quiet; then
echo "commit the reviewed programme and content first" >&2
exit 1
fi
# The 12.6.2 review is a human record, not an export: what was reviewed,
# what changed for new threats, who reviewed it. No note, no tag.
REVIEW="programme/reviews/$STAMP.md"
git ls-files --error-unmatch "$REVIEW" >/dev/null 2>&1 ||
{ echo "commit the 12.6.2 review note $REVIEW first" >&2; exit 1; }
q() {
psql "$MOODLE_DSN" --no-psqlrc --csv -v ON_ERROR_STOP=1 \
-v period_start="$PERIOD_START" \
-v onboarding_course="$ONBOARDING_COURSE" \
-v annual_courses="$ANNUAL_COURSES" \
-v policy_id="$POLICY_ID" "$@"
}
mkdir -p "$OUT"
q -f sql/awareness-gaps.sql > "$OUT/awareness-gaps.csv"
# The population of record: everyone on the roster during the period.
q > "$OUT/roster.csv" <<'SQL'
SELECT h.email, h.worker_type, h.hire_date, h.leave_date,
u.id AS moodle_userid
FROM hr_personnel h
LEFT JOIN mdl_user u ON lower(u.email) = lower(h.email)
WHERE h.leave_date IS NULL OR h.leave_date >= :'period_start'::date
ORDER BY h.email;
SQL
# Hire date beside every awareness completion and policy acceptance.
q > "$OUT/person-timeline.csv" <<'SQL'
SELECT h.email, h.hire_date, e.event, e.ref, e.at_utc
FROM hr_personnel h
JOIN mdl_user u ON lower(u.email) = lower(h.email)
JOIN (
SELECT userid,
CASE WHEN course = :onboarding_course
THEN 'onboarding' ELSE 'annual' END AS event,
course AS ref,
to_timestamp(timecompleted) AT TIME ZONE 'UTC' AS at_utc
FROM mdl_course_completions
WHERE course IN (:onboarding_course, :annual_courses)
AND timecompleted IS NOT NULL
UNION ALL
SELECT a.userid, 'acceptance', a.policyversionid,
to_timestamp(a.timecreated) AT TIME ZONE 'UTC'
FROM mdl_tool_policy_acceptances a
JOIN mdl_tool_policy_versions v ON v.id = a.policyversionid
WHERE v.policyid = :policy_id AND a.status = 1
) e ON e.userid = u.id
WHERE h.leave_date IS NULL OR h.leave_date >= :'period_start'::date
ORDER BY h.email, e.at_utc;
SQL
(cd "$OUT" && sha256sum ./*.csv > SHA256SUMS)
git add "$OUT"
git diff --cached --quiet || git commit -m "PCI DSS 12.6.3.a/12.6.3.d evidence exports, $STAMP"
# Needs a configured signing key. Re-runnable: tags even if the commit exists.
# The 12.6.2 tag points at the commit that added the review note.
NOTE_COMMIT="$(git log -n 1 --format=%H -- "$REVIEW")"
git rev-parse -q --verify "refs/tags/awareness-review-$STAMP" >/dev/null ||
git tag -s "awareness-review-$STAMP" "$NOTE_COMMIT" \
-m "PCI DSS 12.6.2 programme review: $REVIEW"
git rev-parse -q --verify "refs/tags/awareness-exports-$STAMP" >/dev/null ||
git tag -s "awareness-exports-$STAMP" \
-m "PCI DSS 12.6.3.a and 12.6.3.d evidence exports, $STAMP"
git tag -v "awareness-review-$STAMP"
git tag -v "awareness-exports-$STAMP"
Those files contain personal data. Keep the repository readable only by the programme owners and whoever answers the assessor: a retention policy governs when the exports are deleted, not who can read them in the meantime.
Finally, one file tells the assessor where everything lives, and who owns it:
standard: PCI DSS v4.0.1
requirement: "12.6"
population_of_record:
system: hr-roster + idp (hr_personnel)
artefact: evidence/<date>/roster.csv
items:
"12.6.1":
artefact: programme/awareness-programme.md
system: git
owner: security-lead
"12.6.2":
artefact: programme/reviews/<date>.md; signed tag awareness-review-<date> on it
system: git
owner: security-lead
"12.6.3.a":
artefact: evidence/<date>/person-timeline.csv, awareness-gaps.csv
system: moodle (pci site) + hr-roster
owner: people-ops
"12.6.3.b":
artefact: content/ (modules, posters, team-meeting briefs)
system: git
owner: security-lead
"12.6.3.c":
artefact: interview sample drawn by the assessor from roster.csv
system: hr-roster
owner: security-lead
"12.6.3.d":
artefact: evidence/<date>/person-timeline.csv (acceptance rows), awareness-gaps.csv
system: moodle tool_policy (sitepolicyhandler = tool_policy)
owner: people-ops
"12.6.3.1":
artefact: content/phishing-social-engineering/
system: git
owner: security-lead
"12.6.3.2":
artefact: content/acceptable-use/ (maps to 12.2.1 policy)
system: git
owner: security-lead
Exit ramp and the long game
No single tool should hold the only copy of a past period. Export completions and acceptances every cycle, checksum them, and commit them beside the content they relate to. Then the training vendor, or Moodle itself, is a replaceable delivery layer: swap it, and the roster, content history and signed review tags are still yours. Retain and eventually remove those exports with the same discipline as any other record, as in a records retention policy you can prove.
The long game: awareness evidence is a multi-year record, not an annual deliverable. Different samples must be selected for each assessment, so each year an assessor can look somewhere new. A programme that can answer for any person on any date in any past period is an asset the organisation owns.
§FAQ/Common questions
Frequently asked
How often is PCI DSS awareness training required?
Requirement 12.6.3 in PCI DSS v4.0.1 requires training upon hire and at least once every 12 months, using multiple methods of communication, and a personnel acknowledgement of the information security policy and procedures at least once every 12 months.
Does PCI DSS require phishing simulations?
No. Requirement 12.6.3.1 requires training content on phishing and related attacks and social engineering. Periodic testing appears in its Good Practice guidance, not the requirement. The standard also says 5.4.1 anti-phishing controls and 12.6.3.1 training are separate requirements, and neither meets the other.
Do contractors need PCI DSS security awareness training?
If they fall inside the glossary definition of personnel, yes. It covers full-time, part-time and temporary employees, contractors and consultants with security responsibilities for protecting account data or that can impact the security of cardholder data or sensitive authentication data.
What evidence does an assessor examine for Requirement 12.6.3?
Under the defined approach: programme records showing training upon hire and every 12 months (12.6.3.a), materials showing multiple methods (12.6.3.b), interviews with personnel (12.6.3.c), and materials plus personnel acknowledgements (12.6.3.d). Samples come from the complete population, without influence from the entity.
Further reading
Executive Briefing
Thirty minutes to clarify your infrastructure risk
Walk us through your vendor footprint and regulatory constraints. We will tell you honestly where sovereignty creates leverage — and where it does not. No pitch deck. No obligation.